I-1 Summary of Environmental Impacts and Mitigation Measures.............................. I-13
IV.B-1 Level of Service as a Function of ICU Values.................................................... IV.B-5
IV.B-2 Intersection Capacity Utilization (ICU) and Level of Service (LOS) – Existing (2003).. IV.B-8
IV.B-3 Intersection Capacity Utilization (ICU) and Level of Service (LOS) – Future with Circulation Element Update (2025).................................................................... IV.B-18
IV.D-1 State and National Ambient Air Quality Standards............................................. IV.D-6
IV.D-22000 to 2002 Criteria Pollutant Violations – Southwest Coastal LA County Monitoring Station................................................................... IV.D-10
IV.D-4 SCAQMD Daily Construction and Operational Emissions Thresholds.................... IV.D-15
IV.D-5 Estimated Daily Construction Emissions for a Single Prototypical Intersection Improvement (pounds per day)...................................................... IV.D-16
IV.D-6 Estimated Daily Construction Emissions for the Prototypical Construction Scenario (pounds per day).............................................................................. IV.D-17
IV.D-7 SCAQMD Rule 403 – Track-Out Control Options................................................. IV.D-18
IV.F-1 Intersections with Identified Improvements under the Proposed Circulation Element Update............................................................................................................... IV.F-6
IV.G-1 Intersections with Identified Improvements Located in Areas with Expansive Soils..... IV.G-7
IV.I-1 Contaminated Sites Within the City of El Segundo.................................................. IV.I-2
IV.J-1 Comparison of Proposed Circulation Element Update Characteristics to RCPG Policies.............................................................................................................. IV.J-9
IV.K-1 Existing Community Equivalent Noise Levels (CNEL).............................................. IV.K-3
IV.K-2 Noise Level Ranges of Typical Construction Equipment.......................................... IV.K-7
IV.K-3 Outdoor Construction Noise Levels...................................................................... IV.K-7
IV.K-4 Future Estimated Community Equivalent Noise Levels Sound Level at 50 feet (dBA, CNEL)..................................................................................................... IV.K-8
IV.L-1 Population, Housing and Employment Forecasts for the City of El Segundo and South Bay Cities Subregion................................................................................ IV.L-3
VI-1 Intersection Capacity Utilization (ICU) and Level of Service (LOS) – Future No Project with Adopted Circulation Element Roadway Network (2025)..................... VI-7
VI-2 Intersection Capacity Utilization (ICU) and Level of Service (LOS) – Future Under FAR 0.8 Alternative (2025)................................................................................... VI-12
VI-3 Intersection Capacity Utilization (ICU) and Level of Service (LOS) – Future Under FAR 1.0 Alternative (2025)................................................................................... VI-20
VI-4 Intersection Capacity Utilization (ICU) and Level of Service (LOS) – Future Under FAR 1.3 Alternative (2025).................................................................................. VI-26